SANDRESM2 (PA2) was delivered as part of the East Side Coastal Resiliency (ESCR) initiative, a major climate-adaptation program led by NYCDDC to reduce flood risk from coastal storms and sea level rise in Lower Manhattan following Superstorm Sandy.

The PA2 limits extend from the Con Edison facility at East 15th Street to Asser Levy Playground at East 25th Street, including segments under the FDR Drive and Avenue C and associated local streets.

The corridor integrates permanent flood protection infrastructure through floodwalls and movable floodgates, with design criteria aligned to 2050s sea level rise and storm surge projections and incorporating Combined Sewer Overflow (CSO) systems and sustainable drainage strategies.

Utility upgrades were implemented throughout the corridor to strengthen resilience and support long-term service continuity in flood-prone zones. Public-space enhancements were a central deliverable, including upgrades at Asser Levy Playground, Stuyvesant Cove Park, and Murphy Brothers Playground to improve amenities, accessibility, and waterfront use.

The project earned Envision Gold Certification and Waterfront Edge Design Guidelines (WEDG) Verification, reflecting leadership in sustainable, resilient waterfront design.

An extensive project spanning between Bayside and Flushing, QED991 is high-profile and complex. The project upgrades the trunk water main system adding redundancy to the City’s network while reinforcing the transmission (high pressure) lines

project overview 

project highlights

  • Program/Funding: NYCDDC Project under the East Side Coastal Resiliency (ESCR) initiative, jointly funded by the City of New York and the federal government.
     

  • Limits/Extent: East 15th Street (Con Edison facility) to East 25th Street (Asser Levy Playground), including areas under the FDR Drive and Avenue C and associated local streets.
     

  • Major Flood Protection (PA2 Total): Over 3,100 LF of floodwalls and 12 movable floodgates.
     

  • Impact: Delivered critical flood protection infrastructure safeguarding over 110,000 New Yorkers.
     

  • Resilience Design Basis: Designed to meet 2050s sea level rise and storm surge projections; incorporates Combined Sewer Overflow (CSO) systems and sustainable drainage strategies.
     

  • Public Realm: Upgrades within PA2 limits at Asser Levy Playground, Murphy Brothers Playground, and Stuyvesant Cove Park, with enhanced recreational amenities and accessibility.
     

  • Sustainability Recognition: Envision Gold Certification and Waterfront Edge Design Guidelines (WEDG) Verification; ESCR seeks LEED status.
     

  •  : SANDRESM2 budget $163M; Substantial Completion 2024.

engineering leadership

As part of the PM/CM team, MIRABAL served as a subconsultant on the ESCR—SANDRESM2 (PA2) project, a major climate adaptation initiative led by DDC and undertaken in partnership to address the long-term impacts of Superstorm Sandy.

MIRABAL Role

MIRABAL served as asubconsultant supporting delivery through REI services, including:
 

• Oversight of construction inspection activities for flood protection elements, associated infrastructure work, and public-realm restorations
 

• Coordination support across multiple City agencies and stakeholders to maintain alignment across complex urban systems
 

• Documentation and compliance support consistent with NYCDDC requirements for construction administration and closeout

For any inquiries, questions, please call:

646-632-2430

email : Info@mirabalengineering.com

inquiries

socials

31 Howard St. , Suite 414

New York │NY 10013

main office

© 2026 by MIRABAL Engineering. All Rights Reserved.

bottom of page