top of page
.png)

SANDRESM2
East Side Coastal Resiliency, Project Area 2, Borough of Manhattan.
The project earned both Envision Gold Certification and Waterfront Edge Design Guidelines (WEDG) Verification, reflecting its leadership in sustainable, resilient waterfront design
engineering leadership
In collaboration with NYCDDC, the City’s primary capital construction agency, mirabal, in joint venture, leads the engineering team providing all necessary services required for the full construction implementation of the project including management, inspection, coordination, and administration.
project overview
trunk water main scope
QED991 – new trunk & distribution water mains and infrastructure upgrades along 33rd avenue and surrounding areas in bayside and flushing. manhattan, ny

An extensive project spanning between Bayside and Flushing, QED991 is high-profile and complex. The project upgrades the trunk water main system adding redundancy to the City’s network while reinforcing the transmission (high pressure) lines
project overview
bottom of page