top of page
.png)

HWPR19M
the NYC DOT’s Pedestrian Ramp Program ensures that pedestrian ramps throughout the City meet current ADA standards as promulgated by the 2010 American’s with Disabilities Act.
engineering leadership
In collaboration with NYCDDC, the City’s primary capital construction agency, mirabal, in joint venture, leads the engineering team providing all necessary services required for the full construction implementation of the project including management, inspection, coordination, and administration.
project overview
trunk water main scope
![]() | ![]() |
|---|---|
![]() | ![]() |
![]() |
QED991 – new trunk & distribution water mains and infrastructure upgrades along 33rd avenue and surrounding areas in bayside and flushing. manhattan, ny
An extensive project spanning between Bayside and Flushing, QED991 is high-profile and complex. The project upgrades the trunk water main system adding redundancy to the City’s network while reinforcing the transmission (high pressure) lines
project overview
bottom of page



